Editing Patio

Revision as of 03:51, 8 February 2022 by Steve (talk | contribs) (Created page with "The back patio was built in two phases. The first was mainly done by Jared under Steve's direction, using bricks salvaged from when a large part of East Wheeling was torn down to build the athletic field. The second section was added in 2019 using used bricks purchased from Lollini. The work was done by Steve and Andy, with some help from the family when it came time to lay the bricks.")
(diff) ← Older revision | Latest revision (diff) | Newer revision β†’ (diff)
Jump to navigation Jump to search
Warning: You are editing an out-of-date revision of this page. If you publish it, any changes made since this revision will be lost.
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
Please note that all contributions to Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see Wiki:Copyrights for details). Do not submit copyrighted work without permission!
Cancel Editing help (opens in new window)