Patio

From Wiki
Revision as of 03:51, 8 February 2022 by Steve (talk | contribs) (Created page with "The back patio was built in two phases. The first was mainly done by Jared under Steve's direction, using bricks salvaged from when a large part of East Wheeling was torn down to build the athletic field. The second section was added in 2019 using used bricks purchased from Lollini. The work was done by Steve and Andy, with some help from the family when it came time to lay the bricks.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The back patio was built in two phases. The first was mainly done by Jared under Steve's direction, using bricks salvaged from when a large part of East Wheeling was torn down to build the athletic field. The second section was added in 2019 using used bricks purchased from Lollini. The work was done by Steve and Andy, with some help from the family when it came time to lay the bricks.